Test Engineering
Electronics Testing & Validation Services
PentaTech designs automated test equipment, hardware-in-the-loop (HIL) setups, and production test fixtures for electronics products moving toward manufacturing. Rigorous testing during development catches problems while they’re cheap to fix — and a well-designed production test fixture protects your yield once you’re shipping.
The Challenge
Skipping structured testing and validation is one of the most common ways electronics projects run into expensive surprises — field failures, EMC non-compliance discovered too late, or a production line with no reliable way to catch defective units.
Our Approach
We build test infrastructure alongside the product itself: Python-based automated test harnesses for functional validation, HIL rigs for testing firmware against simulated real-world conditions, EMC pre-compliance testing to catch issues before formal certification, and production test fixtures designed for your manufacturing line.
Why Work With Us on Electronics Testing & Validation
| Designator | Line item | Qty | Status |
|---|---|---|---|
| SVC-TV-001 | SVC-TV-001Automated Test HarnessesPython/pytest-based functional test suites that catch regressions before they reach hardware. | 1 | ✓ INCL. |
| SVC-TV-002 | SVC-TV-002Hardware-in-the-LoopHIL rigs that exercise firmware against realistic simulated conditions, not just idealized lab setups. | 1 | ✓ INCL. |
| SVC-TV-003 | SVC-TV-003EMC Pre-ComplianceEarly-stage EMC testing to catch issues before your formal certification test, saving costly re-spins. | 1 | ✓ INCL. |
| SVC-TV-004 | SVC-TV-004Production Test FixturesPurpose-built fixtures designed for your manufacturing line’s throughput and yield requirements. | 1 | ✓ INCL. |
Technologies We Use
Industries Served
Frequently Asked Questions
Common questions about our electronics testing & validation services.
What is hardware-in-the-loop (HIL) testing and do we need it?
HIL testing exercises your firmware against simulated sensor/actuator conditions in real time — valuable whenever real-world testing is slow, expensive, or risky to reproduce in a lab.
Can you help us pass EMC certification on the first attempt?
We can’t guarantee first-pass certification, but pre-compliance testing during development significantly improves your odds and avoids late-stage surprises.
Do you design production test fixtures for contract manufacturers?
Yes, including bed-of-nails, functional test, and boundary-scan fixtures matched to your CM’s process.
Can you write test automation for an existing product?
Yes, we regularly build test automation retroactively for products that shipped without a structured test suite.
Case studies
Ready to Start Your Electronics Testing & Validation Project?
Tell us about your requirements and timeline — we\u2019ll respond within 24 hours with next steps.